Field tools · Calculators

How much, how many, how long.

Simple calculators for planning. Each shows the formula so you can check the number, change the assumption and write the result in your notebook.

Back to tools
Use real measurements. These are planning estimates with default assumptions, not certified designs. Add a margin for loss, weather and construction tolerance. For tanks, roofs, wells, ponds and structural work, have the design checked.

Water

Catchment, tank and pond

Water calculations are the most useful place to start: they turn a vague plan into a tank size and a dry-season target.

Rainwater harvest

Annual volume from a roof, before first-flush losses.

Area × rainfall × coefficient. 1 mm on 1 m² = 1 litre.

Tank size

Storage to bridge a dry spell or supply interruption.

Daily use × days. Add a margin for guests, animals and loss.

Pond volume

Approximate volume for a rectangular or oval pond.

Length × width × average depth. For an oval, use 0.8 as a shape factor.

Underground storage

Cistern volume and excavation

First estimates for a buried tank. The structural design, freeboard, wall thickness and anchorage are separate decisions.

Cistern water volume

Usable water from internal dimensions and water depth.

Length × width × water depth. Subtract freeboard, sediment and the outlet height from the gross tank volume.

Excavation volume

Hole volume and approximate spoil to move or store.

Length × width × depth. Spoil bulks up when excavated; 30% is a rough allowance, not a specification.

Building and land

Roof pitch and seed

Small numbers prevent large mistakes. Check the roof angle before cutting, and the seed rate before sowing.

Roof pitch

Angle and rise per 12 units of run.

Angle = arctan(rise ÷ run). Check local snow, wind and rain requirements.

Seed quantity

Seeds to sow for a target plant population.

Area × density ÷ germination, plus margin. Thin to the final spacing.

Storage days

How long a store lasts at a given daily use.

Stored kg ÷ daily kg. Use a realistic household figure, not the harvest-day estimate.

Land and boundaries

Hedge and boundary planting

Estimate the number of whips for a boundary hedge. Order a little extra for losses and gaps.

Hedge plant count

Plants for one or more rows along a measured length.

Plants ≈ (length ÷ spacing + 1) × rows, plus margin. A double staggered row at 0.4–0.5 m gives a dense hedge; check local spacing for bare-root whips.

Boundary tree spacing

Trees for a line, avenue or shelterbelt.

Trees ≈ (length ÷ spacing + 1) × rows. Match spacing to mature crown size and the purpose: hedge, shelterbelt or standard avenue.

Soil and kitchen

Compost and brine

Two ratios worth knowing: the carbon-to-nitrogen balance of a compost pile, and the salt in a brine.

Compost carbon : nitrogen

Weighted average of browns and greens.

Weighted average. Aim for roughly 25–30:1; these are approximate material values.

Brine strength

Salt to add to a known volume of water.

Salt kg = water litres × percent ÷ 100. For vegetable ferments, weigh salt against the vegetables, not the water.

Lime mortar mix

Approximate volume of lime and sand from parts.

A starting mix, not a specification. Lime type, sand grading and use decide the real ratio.

Check the detail

Where the numbers come from

These are standard planning formulas. The assumptions are stated on each card; local data is always better.

Search the guides for the full method